The implementation of sediment controls on a construction site is essential to minimize the transport of sediments into stormwater systems and natural water bodies. Using silt fences and sediment basins is a highly effective method for this purpose.

Silt fences are temporary barrier systems designed to intercept sediment-laden water, allowing sediment to settle while permitting clean water to pass through. This helps to trap particles and prevent them from being washed away by stormwater runoff.

Sediment basins, on the other hand, are temporary ponds specifically designed to collect and store water, allowing sediments to settle out before the water is released. They are strategically placed to manage the specifics of a construction site’s drainage patterns and capture runoff effectively.

These solutions are commonly employed in construction projects because they are efficient, cost-effective, and can be adapted to different site conditions. By utilizing these sediment control methods, construction sites can significantly reduce the risk of pollution from sediment, thereby protecting waterways and complying with environmental regulations.